 Our Latest Flagship ProjectThe New Methodist Church at Poulton-le-Fylde was built in 1966. The original oak parquet floor was installed that year after construction work was completed. THE WOOD FLOOR STORE lifted this original floor and after preparing the sub-floor we installed 350 square metres of WILTSHIRE 189/21mm BRUSHED & OILED PLANKED OAK MULTI-PLY flooring. This project was finished in the record time of Two Weeks! and to the great satisfaction of the Managing Agent - R J Consultancy and of The Methodist Board of Trustees of Poulton-le-Fylde.
|